THE SUMMIT
The Summit, situated high above the Coffs Coast.
​
Gabion Baskets were used as a retaining structure throughout the construction of roads and footpaths due to the excessive grade/slope of the terrain.
​
The sub division consisted of all aspects of a sub division which includes :
water, drainage, sewer, comms, power and exposed concrete finish on roads.
​
To date the project is at stage 8 and continuing with a possible 2 more stages.
​
​