top of page

THE SUMMIT

The Summit, situated high above the Coffs Coast.

​

Gabion Baskets were used as a retaining structure throughout the construction of roads and footpaths due to the excessive grade/slope of the terrain.

​

The sub division consisted of all aspects of a sub division which includes :

water, drainage, sewer, comms, power and exposed concrete finish on roads.

​

To date the project is at stage 8 and continuing with a possible 2 more stages.

​

​